LED Lamp and Harness Installation
1. Install the inner Light Brackets on the frame tube, approximately 32” from the center of the
frame. Place a Strap under the frame and secure Light Brackets with 1/2-13 X 7-1/2 Screws,
Washers and Locknuts. See pages 7A and 7C.
2. Install the outer Light Brackets on the frame tube using existing Bearing Hanger Hardware.
3. Place the Amber LED’s inside the Light Shields and attach to the outer Light Bracket using 1/4-
20 X 1-3/4 Screws, then attach the Decal Plate to the opposite side of the Light Bracket and
secure with Washers and Locknuts.
4. Attach the Red LED’s to the inner Light Brackets using 1/4-20 X 1-1/2 Screws, then attach the
Decal Plate to the opposite side of the Light Bracket and secure with Washers and Locknuts.
5. Install the Light Module under the Light Module Bracket using two 1/4-20 X 1-1/2 Screws and
Locknuts. Then attach the Light Module Bracket to the frame approximately 5 7/8” right of the center of the
frame using 1/2-13 X 7-1/2 Screws, Washers and Locknuts. See page 7A
6. Attach the 7 pin harness to the Light Module. Route the harness along the frame and to the
front of the 3 point Hitch.
7. Layout the LED Lamp Harness. Note that the cords are marked “Leftand “Right”.
Attach the harness to the Light Module.
8. Route the left 2 plug cord along the top of the left side frame, going through both Light
Brackets. Attach the cord into the Amber LED, repeat for the right side.
9. Route the left 3 plug cord along the top of the left side frame, through the Red LED Light
Bracket. Attach the cord into the Red LED, repeat for the right side.
10. Secure both harnesses with tie straps, making sure to leave enough slack to allow the
machine to raise and lower. Bundle and secure any excess cord with tie straps.
11. Raise and lower machine to check for proper clearance, adjust accordingly.
Important: All wires must be firmly attached to machine frame members, so they don’t sag or
become torn loose by field debris. Use the cable and hose ties provided.
1098rev0813 Page 7B 5K804